HP Headquarters building no. 3

Architect: Amir Mann - Ami Shinar

Location: HP Headquarters Park, Yehud, Israel

Client:     HP

Area:      215,000 sq ft

Status:   Completed 2008

Designer through CD and CA (envelope), and later Job Captain through DD, CD and CA (interiors) – to completion. Including 3D studies, construction drawings and details, consultants coordination, and contractor coordination and site walks throughout the construction process.

“Office Building of the Year” award - Israeli Architecture Magazine 2009.

Archdaily article

HP3 is the 3rd building in the headquarters complex designed by Mann-Shinar Architects.

The main design element is an internal, egg-like structure, running through the entire building and housing the core facilities: Stairwells, elevators, bathrooms, kitchenettes, storage and techinical rooms, main technical shafts and security rooms (as per Israeli Building Code).

The wood clad egg is surrounded by by open workspace areas and an eight floors high atrium.

The building is framed by aluminum clad walls and roof, whice also enclose curtain walls through which the egg is glimpsed.

 

- Sivan Hecht. Portfolio - Western Facade
Western Facade
- Sivan Hecht. Portfolio - North-west corner
North-west corner
- Sivan Hecht. Portfolio - Facade detail
Facade detail
- Sivan Hecht. Portfolio - Curtain wall details: Anchoring steel beam to wall
Curtain wall details: Anchoring steel beam to wall
- Sivan Hecht. Portfolio - Curtain wall details: Anchoring steel beam to INP300
Curtain wall details: Anchoring steel beam to INP300
- Sivan Hecht. Portfolio - Curtain wall details: Spider element
Curtain wall details: Spider element
- Sivan Hecht. Portfolio - Northern Facade
Northern Facade
- Sivan Hecht. Portfolio - The Egg housing core facilities
The "Egg" housing core facilities
- Sivan Hecht. Portfolio - Atrium
Atrium
- Sivan Hecht. Portfolio - Egg construction
Egg construction
- Sivan Hecht. Portfolio - Egg construction
Egg construction
- Sivan Hecht. Portfolio - Cross section through the atrium and egg
Cross section through the atrium and "egg"
- Sivan Hecht. Portfolio - Main stairwell
Main stairwell
- Sivan Hecht. Portfolio - Main stairwell
Main stairwell
- Sivan Hecht. Portfolio - Connecting bridges
Connecting bridges
- Sivan Hecht. Portfolio - Atrium lighting
Atrium lighting
- Sivan Hecht. Portfolio - Open work Space around the Egg
Open work Space around the Egg
- Sivan Hecht. Portfolio - The Egg housing core facilities
The "Egg" housing core facilities
- Sivan Hecht. Portfolio - Typical floor plan
Typical floor plan
- Sivan Hecht. Portfolio - Open work Space around the Egg
Open work Space around the Egg
- Sivan Hecht. Portfolio - Auditorium render
Auditorium render
- Sivan Hecht. Portfolio - Auditorium construction
Auditorium construction
- Sivan Hecht. Portfolio - Auditorium
Auditorium
- Sivan Hecht. Portfolio - Cafeteria render
Cafeteria render
- Sivan Hecht. Portfolio - Cafeteria
Cafeteria
- Sivan Hecht. Portfolio - Roof terrace
Roof terrace
- Sivan Hecht. Portfolio - Eastern Facade
Eastern Facade
- Sivan Hecht. Portfolio - HP3 construction
HP3 construction
- Sivan Hecht. Portfolio - HP3 & HP2
HP3 & HP2
-